Analisis Perawatan Crane Hoist pada Intake PLTA Maninjau

  • Rafika Andari Fakultas Teknik, Program Studi Teknik Elektro Institut Teknologi Padang, Indonesia
  • Sitti Amalia Fakultas Teknik, Program Studi Teknik Elektro Institut Teknologi Padang
  • Syafeii Syafeii Fakultas Teknik, Program Studi Teknik Elektro Institut Teknologi Padang
Keywords: Crane Hoist, Maintenance, PLTA, Trafo Pendant

Abstract

The purpose of this research is to identify the type of crane hoist and examine the maintenance procedure that must be followed if the PLTA Maninjau Intake Hoist crane sustains damage. At the Maninjau hydropower facility, two treatments are carried out: routine maintenance and repair maintenance. Preventive maintenance (routine) is frequently performed on the PLTA Maninjau intake hoist crane four times a month / once a week. Corrective type maintenance is performed for transformer and contactor damage because it replaces components. As for pendan damage, only predictive type maintenance is carried out. Initially, each crane equipment was checked, then tested by operating the crane and checking which parts had malfunctioned or were damaged based on their use. If the crane being operated is damaged, then a re-check is carried out on the circuit or on the crane equipment that has failed. If the crane has no problem/damage, it means that the crane is in good condition and the inspection is complete.

Downloads

Download data is not yet available.

References

Assauri, S. (2008). Manajemen Produksi Dan Operasi, Penerbit UI, Jakarta, edisi revisi, 2008.
Hardianto, A., Pratikto, P., & Yuliati, L. (2015). Perawatan Hoist Crane Dengan Metode Maintainability Dan Costing Untuk Mengurangi Breakdown. Journal of Engineering and Management Industial System, 3(2), 127–132. https://doi.org/10.21776/ub.jemis.2015.003.02.10
Harsanto. (2013). Dasar Ilmu Manajemen Operasi. Bandung: UNPAD.
Industri, J. T., Teknik, F., & Andalas, U. (2014). EVALUASI KINERJA PEMELIHARAAN PLTA DENGAN PENDEKATAN MAINTENANCE SCORECARD DAN OBJECTIVE MATRIX ( OMAX ) ( Studi Kasus Unit Pembangkit Listrik Tenaga Air Maninjau ). 13(1), 561–574.
Kurniawan. (2013). Manajemen Perawatan Industri: Teknik dan Aplikasi Implementasi Total Productive Maintenance (TPM), Preventive Maintenance dan Reability Centered Maintenance (RCM). Yogyakarta: Graha Ilmu.
Kuswara, H. S. (2020). Menurunnya daya angkat.
Manzini. (2010). Maintenance for Industrial Systems. London: Springer.
Maros, H., & Juniar, S. (2016). Analisa sistem Angkat Pada Crane Hoist. 1–23.
Muin. (1970). Perawatan Crane Hoist Dengan Metoda Problem Soulving. Crane Hoist.
Narang, S. dan. (2001). Production Management. Nai sarak: Dhanpahat RAI Co.
Render, H. dan. (2011). anajemen Operasi Buku Kedua. Jakarta: Salemba Empat.
RIO YUSUF, L. (2019). Perawatan Pesawat Angkut (Crane) Di Pt. Pelindo Iii Cabang Tanjung Emas Semarang. Perawatan Pesawat Angkut (Crane) Di Pt. Pelindo Iii Cabang Tanjung Emas Semarang. Karya Tulis., 5–24.
Published
2023-08-01