Abstract
Monitoring works is considered have significant impact on the office's internal processes, the propper PMS is needed. This study aims to manage the organizational performance of PT XYZ company using Knowledge Based Performance Management System (KBPMS) framework approach developed by Wibisono (2006). The proposed model was developed by combining a literature review and a case study approach applied to construction companies especially from previous studies in Indonesia. The data is analyzed to assess the suitability of the company's strategy with the current PMS used in the company, and to determine suitable performance indicators to be used in the proposed model. The analysis was carried out using a qualitative approach and multi-criteria decision-making with an analytical hierarchy process (AHP) approach from experts at the managerial level of the company. The research shows that there are at least 16 aspects and 20 performance measurement variables proposed for the monitoring division to support PT XYZ's performance. The development of this model is still in a stage that needs to be developed further. Evaluation and improvement of the PMS implementation will be planned in the future.
Downloads
References
Armstrong, H., 2009, Amstrong’s handbook of Human Management Practice-11th edition, United Kingdon, Kogan Page Limited.
Averson, P., Howard R, David W., Gail P., Larry H., & Joe D., 2018, The Strategic Management Maturity Model, Balance Sorecard Insitute.
Badan Pusat Statistik. (2021): Indonesia Dalam Angka.
Badan Pusat Statistik. (2021): Statistik Konstruksi.
Badan Pusat Statistik. (2022): Indonesia Dalam Angka.
Badan Pusat Statistik. (2022): Statistik Konstruksi.
Costa, D. B. 2003. Guidelines for conception: Implementation and use of performance measurement systems in construction companies.MS dissertation, Post Graduate Course in Civil Engineering, Federal Univ. of Rio Grande do Sul, Brazil
Costa, D. B., and Formoso, C. T. 2004. A set of evaluation criteria for performance measurement systems in the construction industry. J. Finan. Mange. Property Constr.
Fatima, I., Wibisono, D., and Adhiutama, A. (2019): Conceptual framework of Performance Management System for construction companies in Indonesia, International Journal of Innovative Technology and Exploring Engineering
Fatima, I., Wibisono, D., and Adhiutama, A. (2017): Main performance indicators for a construction company in Indonesia, Asia Pacific Journal of Advanced Business and Social Studies
Fatima (2022): Proposed Design of Performance Management Systems For Construction Companies In Indonesia: Dissertation
Formoso, C. T., and Lantelme, E. M. V. 2000. A performance measurement system for construction companies in Brazil. Int. J. Proj.
Formoso, C. T., and Lantelme, E. M. V. 2000. A performance measurement system for construction companies in Brazil. Int. J. Proj.
Neely, A., et al. 1996. Design performance measure: A structural approach. Int. J. Operat. Product.
Neely, A., 2005. The Evolution of Performance Measurement Research: Developments in the Last Decade and a Research Agenda for the Next. Int. J. Oper. Prod. Manage, 25(12), pp. 1264-1277.
Neely, A., 2007, Business Performancr Measurement:Unifing theories and integrating practice, United Kingdon, Cambridge University Press
Wibisono, D.,2006. Manajemen Kinerja: Konsep, Desain, dan Teknik Meningkatkan Daya Saing Perusahaan, Jakarta: Penerbit Erlangga
Wibisono, D., (2012) : How To Create World Class Company. Jakarta. PT. Gramedia Pustaka Utama
Copyright (c) 2022 Ahmad Kemal Arsyad, Dermawan Wibisono
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.